Use the Add 1 Equipment button on the Task entry, Equipment List Tab to schedule (see scheduling concepts) a piece of equipment for the current task. Simply fill out the form and click OK. The Equipment selected will be added to the current task.
NOTES: If Schedule By is disabled (with Schedule by Days selected) this means that the selected equipment is not metered. See Equipment Setup to flag whether the piece of equipment has a meter reading associated with it.