Home : Presentations : Waste Water - Real Time BOD Estimation Case
Q13934 - Waste Water - Real Time BOD Estimation Case

Problem:

BOD results, a 5-day lab test, make it challenging for plant operations to adjust treatment processes to adverse levels of BOD real-time.

Plan:

Hach WIMS™ correlation tools automatically generate a site specific equation  to estimate BOD in real-time based  on comparison of Hach UVAS on-line  sensor  (SCADA data) against lab BOD measurements made with the HQ430 Benchtop meter with the IntelliCAL LBOD probe. 

Efficient Management


  • UVAS readings can now be used confidently to predict BOD
  • The equation generated by Hach WIMS can be imported into a SCADA system for real time monitoring of the estimated BOD
  • “Slugs” can now be detected as they come in and can be properly handled
  • The plant treatment process is protected from high organic loads
  • Compliance excursions due to unexpected organic loads are minimized
Related Articles
No Related Articles Available.

Article Attachments
Waste Water App Story - RealtimeestimationBODstudy-2.pptx

Related External Links
No Related Links Available.
Help us improve this article...
What did you think of this article?

poor 
1
2
3
4
5
6
7
8
9
10

 excellent
Tell us why you rated the content this way. (optional)
 
Approved Comments...
No user comments available for this article.
Created on 8/15/2012 8:44 AM.
Last Modified on 8/15/2012 8:45 AM.
Last Modified by No Author Name Available!.
Article has been viewed 4833 times.
Rated 3 out of 10 based on 3 votes.
Print Article
Email Article